LED Street Lighting with JMJX-D, RoHS Directive-compliant
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-08-02 08:26
- Browse the number:
152
Company Profile
- Zhejiang Coursertech Optoelectronics Co. Ltd By certification [File Integrity]
-
Contact:
zjcoursertech(Ms.)
- Telephone:
-
Area:
Beijing
-
Address:
Maqiao Feng Le Road 66, Xiuzhou District, Jiaxing, Zhejiang, China (314000)
- Website: http://zjcoursertech.nai-chuang.com/
Product details
Model Number: JM2LW-17-40
Brand Name: Courser
Key Specifications/Special Features:
Warranty: 5 yearsCertification: CERoHS Directive-compliantPower: 20 to 200WLED chip:American Bridgelux: 145lm/W, but usually only 100lm in market30W light, totally 4350lmCan be get same brightness as 48W from other supplierPower: 48W x 100lm/WLuminous flux: 4,800lmSame brightness, at least 30% lower than other manufacture, so for solar light will directly lower configuration of whole system and finally to save more money for clients
Heat radiator:
Light reflector:
Integration design of power supply:
- Aluminum alloy is best choice of heat dissipationUses die casting aluminum, light body temperature will keep more than 60°C
- But, light body which is also heat radiator made of stretch formed aluminum alloy will keep temperature only 40°C, which will directly lower light decay and prolong lifespan of LED
- Light source collected, so firstly important thing to make LED source diffusion and uniformization
- Design principle of our reflector, when manufactures who use lens, go against this principle
- Reach 3 times reflect and makes light efficiency 30% higher than common supplier, meanwhile, can make light area broader such as 32W can get 30m diameter illumination area, when other supplier only can get 20m
- Usually we put this power supply in pole (under part), because LEDs itself has very long life, when LED light does not work, problem mostly is from power supply, so now we can even ride bike to exchange if LED light does not work, largely decreases maintenance fee as we need not use crane to take light down to do repair any more
Shipping Information:
- FOB Port: Shanghai
- Lead Time: 2 - 15 days
- HTS Code: 9405.40.90 00
Main Export Markets:
- Asia
New Products
-
Hair Remover Laser
price: Negotiable
-
Sandalwood Box Scented Wood Box
price: Negotiable
-
Casket Cinerary Casket
price: Negotiable
-
2W Direct Acting Solenoid Valve
price: Negotiable
-
Laser Hair Removal Beauty Machine
price: Negotiable
-
Mini Brushless Fan
price: Negotiable